QUALITY CONTROL

🔬

Raw Material Verification

Every batch of SBR/CR/SCR neoprene is inspected for thickness tolerance, density, and elasticity before entering production.

⚙️

In-Process Monitoring

Lamination, cutting, and sewing stages are monitored in real-time to catch deviations immediately.

📋

Pre-Shipment Inspection

Finished goods undergo 100% appearance check and AQL 2.5 sampling for functional tests before export.

Our QC System

Three-Stage Quality Control Process

QualityControl_02

Stage 2.In-Process Quality Control (IPQC)

Real-time monitoring at every production station ensures deviations are caught and corrected before they become costly defects.

QualityControl_01

Stage 1.Incoming Material Control (IQC)

Raw materials are the foundation of product quality. We reject any neoprene roll that fails density or lamination peel-strength standards — this is why our bonded fabrics last longer under stress.

QualityControl_03

Stage 3.Final QC & Pre-Shipment Inspection

Before any goods leave our factory, they must pass our final gateway inspection tailored to product category and destination market requirements.

Material Lab

Laboratory Testing Capabilities

Beyond production-line checks, we conduct laboratory-grade verification on critical material batches.

Test Item Standard / Method Applicable Products
Peel Strength ASTM D751 All laminated fabrics
Tensile Strength ASTM D412 Neoprene sheets, supports
Elongation at Break ASTM D412 Raw material verification
Hardness (Shore A) ASTM D2240 All neoprene grades
Color Fastness to Rubbing AATCC 8 Printed / dyed products
Color Fastness to Washing AATCC 61 Garments, bags, sleeves
Formaldehyde Content ISO 14184-1 Skin-contact items
pH Value ISO 3071 Textile-backed neoprene
NCR Handling

Non-Conforming Product Process

Transparency in how we handle defects builds long-term trust with our partners.

1

Identification

Red-tag isolation on production line within 30 minutes.

2

Root Cause

24-hour analysis: material, equipment, or operator issue.

3

Corrective Action

Rework, scrap, or supplier claim based on severity.

4

Verification

100% re-inspection of reworked batch.

5

Prevention

SOP update and staff retraining to prevent recurrence.